History:

  • UCIL was established established on 31Jestha,2044 (14th June,1987)
  • UCIL is located in Udayapur District of eastern region, which is nearly 200Km for Jogbani Border India.
  • Project Implementation on Full turn Key basis.
  • Consulting Engineer: Onoda Engineering Co.Ltd.Japan.
  • Turnkey Contractor: Consortium of Kawasaki Heavy Industries Ltd and Tomen Corporation –Japan.

Annual Requirements

Raw Materials:

  • Lime Stone:3,30,000 MT.
  • IronOre     :4,000 MT.
  • Clay          :57,000~82,500 MT.
  • Gypsum     :10,500 MT.
  • Silica Sand : up to 21,000MT.

Utilities:

  • Fuel requirement
    (i) Coal 50,000MT/Year (ii) Furnace Oil :12,000 KL.
  • Electricity: 8000KW.
  • Water 1500 M3/ Day.


Product:

We sell our product under the brand name of "Gaida Cement", one of the best in Nepal, and known for its quality and strength.

Some of the features our cement is known for are:

  • High Compressive Strength
  • Proper balance in Physical and Chemical properties
  • Less time required for setting
  • Setting Time and Fineness is in optimum range which prevents Offset Construction Defect
  • High Soundness Level prevents unnecessary expansion in concrete structure, and hence prevents cracks
  • Low amount of Loss on Ignition (LOI) and Alkali
  • Consistency in Quality
  • Less Construction Cost